Our Projects
We take great pride in our work, and we don’t settle for anything short of exceeding client expectations. Here is a collection of some of the projects we have achieved with our clients.

Kinder Morgan
Three-story Tilt-wall Office Building (82,000 square feet) with 145,000 square feet of site pavement.
Client: Metzger Construction
Completed: April 2017
Location: Pasadena, TX

Air 59
685,400 square feet Tilt-wall warehouse with 698,000 square feet of site pavement.
Client: ARCO Design/Build
Completed: October 2019
Location: Humble, TX

University Commons
110,000 square feet Tilt-wall retail shopping center with 286,000 square feet of site pavement.
Client: Arch-Con Corporation
Completed: December 2018
Location: Sugar Land, TX

Valley Ranch
119,000 square feet Tilt-wall retail shopping center with 526,000 square feet of site pavement.
Client: Arch-Con Corporation
Completed: August 2017
Location: New Caney, TX

JDA Bayport South 2
255,200 square feet Tilt-wall warehouse with 272,000 square feet of site pavement.
Client: Arch-Con Corporation
Completed May 2018
Location: Pasadena, TX

JDA OPB
150,000 square feet Tilt-wall warehouse with 157,000 square feet of site pavement.
Client: Arch-Con Corporation
Completed October 2018
Location: Pasadena, TX

Best Buy
550,000 square feet Tilt-wall warehouse with 569,000 square feet of site pavement.
Client: E. E. Reed
Completed August 2018
Location: Missouri City, TX

Grocer’s Supply
770,000 square feet Tilt-wall warehouse 1,180,000 square feet of site pavement.
Client: E. E. Reed
Completed April 2019
Location: Houston, TX

Parc Air 59
Three tilt-wall warehouse buildings (160,000 square feet, 80,000 square feet, & 80,000 square feet) with 437,000 square feet of site pavement.
Client: Arch-Con Corporation
Completed June 2019
Location: Houston, TX

American Omni
30,000 square feet, two-story tilt-wall featuring radiused panels at the entrance. Entry panels required intricate forming and foam placement to achieve the desired effect. 2019 TCA award winner.
Client: E. E. Reed
Completed May 2018
Location: Katy, TX

Andretti Indoor Karting & Games
86,000 square feet tilt-wall building with 120,000 square feet of concrete pavement.
Client: ARCO/Murray
Completed November 2019
Location: Houston, TX

Clay 99 – Building 5
434,000 square feet Tilt-wall warehouse with 530,000 square feet of site pavement.
Client: Duke Realty
Credit: Seeberger Architecture & G. Lyons Photography
Completed February 2020
Location: Katy, TX

Project Miriam
A large, structural steel-frame, e-commerce sortation and fulfillment facility that includes an insulated tilt-wall panel skin and five levels of slab-on-metal deck to support robotic sortation.
More than 60 dock levelers and three dock-high ramps to keep goods moving.
Site consists of 823,400 square feet of 8-inch thick slab-on-grade, 2.93 million square foot slab-on metal deck, 152,000 square feet of tilt-up panels and 1.34 million square feet of site paving.
Client: Graycor
Location: Richmond, TX

Project McFly
Large warehouse with retrofitted mezzanine deck featuring 185,804 square-feet of concrete placed on the deck alone.
Overall, the structure consists of 806,000 square feet concrete floor slab, 166,000 square feet of tilt-up panels, and 1.3 million square feet of site paving.
Completed: July 2021
Location: HOU 5 Building, Katy TX

Monument Business Park | Phase II
Warehouse featuring more than 215,500 square feet of on-site concrete paving and over 80,000 square feet of tilt-up wall panels. Over 174,500 square feet of slab-on-grade concrete, 78,500 square feet of tilt-up panels and over 11,600 cubic yards of placed concrete
Client: E.E. Reed Construction
Completion: Spring 2022
Location: Deer Park, TX

Floor & Décor Project Falcon
1.5-million-square-foot distribution center featuring 2,295,000 square feet of on-site concrete paving, 228,750 square feet of tilt-up wall panels. 7,650 square feet of slab-on-medal deck and 102,000 cubic yards of placed concrete.
Client: Arch-Con Corporation
Completion: Winter 2022
Location: Baytown TX

AMZ IAH3 Prolgois President’s Park
This huge distribution center consists of 625,000 square feet of slab-on grade concrete. Our scope includes 160,000 square feet of tilt-up wall panels, 1,890,000 square feet of paving, 24,000 square feet of slab-on-medal-deck and 71,000 cubic yards of concrete placed.
Client: E.E. Reed Construction
Completion: Fall 2022
Location: Houston, TX
COMMITMENT
We commit to providing a safe and healthy environment for ourselves and those around us. We strive to be proactive in the planning of our work with our customers to make your jobs more successful, reduce costly mistakes and call backs, which impact costs and creates schedule delays.